Design documentation shall be prepared by the power utility without issuance of technical conditions…

Design documentation shall be prepared by the power utility without issuance of technical conditions to the customer

Based on the report:

State:

National Energy and Utilities Regulatory Commission,

Status:

Implemented

— comments: According to the clause 4.6.2 of the Code on Distribution Systems in the case of standard and non-standard “turnkey” hook-up, the development of design and appraisal documentation for the electrical installation of external power supply is carried out by the DSO (and includes an input device with a switching device).Meanwhile, the technical specifications contain requirements for engineering maintenance in the customer's networks and, accordingly, the design and construction thereof shall be ensured by the Customer; the terms of reference (technical task) contain the requirements for engineering maintenance in the DSO networks and, accordingly, their design and construction shall be carried out by the DSO.

Open info Close info

Next recommendation: To simplify the process of approving project documentation by power utility with various third parti...